Peoria Civic Center HVAC Ductwork Fabrication and Installation

Client:  Commercial Mechanical 

Project Location:  Peoria, IL

Project Fee:  $2.1 million

The Peoria Civic Center project included the Exhibit Hall D, Grand Ballroom, Lexus Club and Great Hall areas.  This $55 million dollar expansion required JCC’s HVAC and Fabrication teams to work cautiously on 70 foot high ceilings to install the ductwork we fabricated. Aerial lifts were utilized to work on the ceilings, which required skilled and trained staff.   There were 8,500 shop fabrication hours and 22,500 field installation hours to complete this massive project.