Beckman Institute at University of Illinois HVAC Ductwork Installation

Client:  University of Illinois

Project Location:  Champaign, IL

Project Fee:  $3.4 million

This 6 story building required 26,000 field hours, 16,000 shop fabrication hours and 600,000 lbs. of galvanized and aluminum ductwork.